Project Overview
Ingleford Scaffolding Ltd was appointed by Springs Roofing to provide scaffolding solutions for a roofing refurbishment project at Hunter House. The works required safe and reliable access systems to support the roofing teams throughout the 16 week programme.
The Solution
Our team installed a bespoke scaffold system including a 5.2 metre hoist tower with 21 lifts, designed to transport materials and equipment safely across multiple levels. The hoist system improved efficiency on site by allowing heavy materials to be moved quickly and safely.
The Result
The scaffolding provided secure access for the roofing refurbishment works while maintaining high safety standards throughout the project. Through careful planning and collaboration with Springs Roofing and site management, the project was successfully delivered within the 16 week timeframe.