9 March 2026 F&I Group

Daysh Building

Contractor: SRM
Project Location: Newcastle

Project Overview

The Daysh Building, constructed in 1968, was originally designed to accommodate 13 departments including languages, law and geography. The building required a new roofing solution to improve drainage performance and long term protection.

The Solution

A Bauder Blue Roof SUDS system was installed. This sustainable drainage solution is designed to manage stormwater on flat roofs and is particularly effective in flood sensitive areas.

As part of the works, the existing solar panels were carefully removed prior to installation and reinstated once the new roofing system was complete.

The Result

The completed system provides effective stormwater management while protecting the building with a durable flat roofing solution. The reinstated solar panels ensure the building can continue benefiting from renewable energy.

Delivering excellence
in every project

Explore projects from across the F&I Group, showcasing the quality, expertise and dedication behind every job, each one reflecting our commitment to excellence and precision.

Looking for a career that reaches new heights?

Join a team that values skill, safety, and ambition. At John Flowers, we offer exciting opportunities to grow your career across a range of specialist trades, with hands-on training, ongoing support, and professional development every step of the way.

Work with us Work with us

Want to learn more?
Download our brochure

Receive our latest company brochure and sign up for occasional updates, project highlights, and industry insights from F&I Group.